PROJECT INFORMATION

  • Client : McArdle sport tec  
  • Type : Multiple Pitch construction  
  • Value : £200,000
  • Completion Date : July 2018  

CASE STUDY

The Project was for the creation of a New Training Facility for Reading FC.

AJM's works included: -
  • Removal of Topsoil and Sub-soil under Archaeological Supervision.
  • Carry out the cut/fill to the required areas utilising GPS machine control for optimum accuracy.
  • Trimming and preparation of Pitch Areas for 3G and stitched surfacing
  • Resoiling to the natural pitches and surrounding areas to a specification required by the landscape contractor.
  • On-going variations during the works meant constant surveying and quantity calculations were carried out by AJ Morris to ensure the most efficient use of available materials.